To Delmon Precast

The leading concrete supplier in Bahrain

Since 1973 Delmon Readymix has played a major part in the construction of modern Bahrain, with well over 10 million cubic metres of top quality concrete produced to date. We constantly strive to improve our position not just in terms of size but in product quality, service and safety.

The company was originally established by Abdulla Ahmed Nass as Bahrain’s first producer of concrete. Throughout the 1980’s, 1990’s and early 2000’s the business benefited from partnerships with first Tarmac, then Redland and later technical support from Lafarge International, all leading European based international building material companies. As such the company benefited from the local knowledge and expertise of a major construction company together with the latest product and equipment technology available internationally. In 2006 the company went public as a part of Nass Corporation. Delmon Readymix has related building material companies, these include Delmon Precast WLL., Bahrain Building Chemicals WLL and Dona Marine WLL, which between them supply an extensive range of products to the construction industry.

Our Mission

To be the concrete supplier of choice in Bahrain for quality, service and safety.

Through:
– Delivering consistent high quality products, professional technical advice and engineered solutions
– Building long term relationships by partnering with customers, consulting engineers, architects and developers
– Striving for zero incidents/accidents through caring for the health and safety of all our employees, customers and the public.

Our Values

  • Integrity
  • Excellence
  • Customer Satisfaction

At Delmon Readymix we believe in building structures and relationships that last

Jon Mottram
- Managing Director

In 1983 we had two concrete plants, four pumps and twenty mixer trucks... today we have ten concrete plants supplying everything from villa developments to major industrial projects

Mike Vine
- Sales Manager

Services & Facilities

Project Case Studies

The World Trade Centre

Reaching to over 240 metres in height the building consists of two iconic 50 storey towers.

Delmon supplied 100,000 cubic metres of concrete to the project. The Company achieved a record in Bahrain by completing each of the two 4,000 cubic metre foundation pours in less than 24 hours. To reach the full height the company utilised a high capacity static concrete pump and two hydraulic placing booms.

Date | Nov 2005 – Nov 2006
Cubic Metre | 100,000
Main Contractor | Nass, Murray & Roberts
Consultant | W S Atkins

Four Seasons Hotel

The Four Seasons Hotel rises over 200 metres above Bahrain Bay, transforming the Manama skyline. Situated on an island in the centre of the Bahrain Bay, construction work on site commenced in 2010.

Delmon supplied over 50,000 cubic metres of high performance concrete for the twin towers, most of which is 60N self-compacting concrete. The Company used two high capacity static concrete pumps feeding a hydraulic placing boom located in each tower.

Date | Apr 2012 – Apr 2014
Cubic Metre | 50,000
Main Contractor | Six Construct
Consultant | HAJ / Cowie

Durrat Al Bahrain

Located on the southern tip of Bahrain Durrat Al Bahrain is one of the world’s most distinctive island developments. The Durrat development consists of 15 interconnected islands along with a marina and planned golf course.

Over a five year period Delmon supplied over 300,000 cubic metres of concrete from its on-site batching plants. Supplying to housing, bridges, quay wall precast blocks, roads and infrastructure works.

Date | 2005 - 2010
Cubic Metre | 300,000
Main Contractor | Chapo / Kooheji / GPZ / Projects
Consultant | W S Atkins

DIYAAR AL MUHARRAQ

Diyaar Al Muharraq is a new development situated on the northern shores of Muharraq, its amenities will include over 40 kilometres of waterfront, together with sandy beaches and will eventually accommodate over 100,000 people.

Delmon Readymix has been involved from the outset and has supplied over 150,000 cubic metres of concrete so far for the reclamation and infrastructure phases. This includes the casting of over 30,000 sea defense accropods.

Date | Nov 2009 – Ongoing
Cubic Metre | 150,000
Main Contractor | Nass Contracting
Consultant | Aecom

ASRY QUAY WALL

Completed in 2011 the project involved the construction of a new quay wall to accommodate the latest supertankers at the ASRY shipyard. The 1,380-metre quay wall, with a water depth of up to 12 metres, was designed to receive 300,000 DWT vessels.

Delmon supplied 125,000 cubic metres of concrete to an onsite precast yard at a rate of 500 cubic metres per day, involving the casting of precast quay wall block units weighing up to 120 tonnes each.

Date | Apr 2010 – July 2011
Cubic Metre | 125,000
Main Contractor | Nass Contracting
Consultant | Royal Haskoning

AL DUR POWER STATION

Al Dur is the largest independent power and water desalination plant in the Kingdom of Bahrain. It generates 1,234 MW of electricity and produces 48 million gallons of desalinated water per day, taking the total power generation capacity of Bahrain to 4,000 MW.

The power station came into operation in February 2012. Delmon supplied over 40,000 cubic metres of concrete from both the Durrat and Salmabad operations.

Date | Feb 2009 – Jul 2011
Cubic Metre | 40,000
Main Contractor | Chapo / Cebarco Bahrain
Consultant | Hyundai Heavy Industries

BAHRAIN MAP JUNCTION

Upgrading the Bahrain Map Junction near Tubli to a two-level junction with a flyover.

This project involved the construction of 7 span post tensioned bridges, with 3 lanes carriageways each side at the Junction Interchange, together with its associated slip roads.

Date | Jun 2008 – May 2010
Cubic Metre | 30,000
Main Contractor | Nass Contracting
Consultant | Parsons International

ISA TOWN FLYOVER

The three level junction includes two-lane dual carriageway flyovers, a three-lane dual carriageway underpass and an at grade bridge. It is the first flyover in Bahrain to utilise a launching girder to install a total of 700 precast viaduct segments ranging from 60 to 140 tonnes each.

Delmon supplied 50N concrete to satisfy the extremely tight tolerances required for casting of the precast segments. In addition, 60N Smart Dynamic self-compacting concrete was also used.

Date | Apr 2010 – Sep 2011
Cubic Metre | 50,000
Main Contractor | Nass Contracting
Consultant | Hyder

KING HAMAD HOSPITAL

Construction of a new four storey, 312 bed General Hospital to First Class International Standard in Busaiteen; together with all associated facilities, infrastructure, and site works.

The construction works encompassed a three-block configuration separated by courtyards. Each block is connected to its neighbors via two parallel sky-walks running east-west. The work also includes the construction of a car park capable of accommodating 951 cars and a Helipad.

Date | Nov 2006 – Jun 2010
Cubic Metre | 35,000
Main Contractor | Nass - Burhan Int. JV
Consultant | Australian Hosp.Design

ARCAPITA BUILDING HQ

Forming part of the Bahrain Bay development, The Arcapita Bank Headquarters is a prestigious landmark with cutting edge design by Skidmore Owings and Merrill. The building is 48 metres high and consists of 7 floors. The project comprises quality office space, conference facilities, an auditorium and a restaurant.

Date | Apr 2007 – June 2010
Cubic Metre | 20,000
Main Contractor | Nass, Murray & Roberts
Consultant | W S Atkins

Health & Safety

Delmon Readymix is striving for zero incidents / accidents through caring for the health & safety of all our employees, customers and the public. To support this, the Company employs a full time Safety Officer to provide training and to ensure the Company operates to international safety standards. It is our aim to lead health & safety improvements in the readymix industry in Bahrain.

The Company achieved the OHSAS 18001:2007 certification for health & safety management in 2010 and has since upgraded to the new ISO 45001:2018 standard.

The Company is passionate in protecting and supporting the health of our employees and has an on-site medical clinic, approved by the NHRA. Our nursing staff provide help, support and advise to employees with all their health related issues.

Health & Safety Certification

Team

  • Jon Mottram

    Jon Mottram

    Managing Director

  • Mike Vine

    Mike Vine

    Sales Manager

  • Nick Davis

    Nick Davis

    Technical Manager

  • Rosh Paulose

    Rosh Paulose

    Finance Manager

  • Robert Jones

    Robert Jones

    Operations Manager

  • Melad Ahmed

    Melad Ahmed

    Sales Representative

  • Manoj KM

    Manoj KM

    Sales Representative

News

Taking Recycling to New Heights

Delmon Readymix has completed a major upgrade to their concrete recycling facility at their Salmabad production location.  100% of the waste concrete generated through the cleaning of the transit mixers and concrete pumps, along with any concrete returned from customers sites, is now fully recycled with no materials…

ISO Certification Success

The team at Delmon Readymix are proud to have received a clean audit for ISO 9001 and 450001.  In addition achieving ISO 14001 certification in Environmental Management for the first time.  Mr. Jon Mottram, Managing Director, stated that, “It is our aim to lead environmental improvements in the…

Delmon is Featured on Bahrain TV – Made in Bahrain

Delmon Readymix and Delmon Precast featured in the “Made in Bahrain” TV series, aired on the 7th and 8th April 2020. The program was developed by the Ministry of Industry, Commerce and Tourism (MOICT) to highlight advanced national industries in various fields. The companies are proud to have…

See all news

Get In Touch

Salmabad Office +973 17783838
Hidd Office +973 17677466
North Alba Office +973 77373210
Fax +973 17784 467
[email protected]