Batching Plants

Salmabad Plant

0

Cubic metres of
concrete per hour


Delmon’s main factory is situated centrally at Salmabad (Isa Town). It operates Bahrain’s highest-capacity concrete batching plants, with a combined output of 300 cubic metres of mixed concrete per hour four plants. 

Plant 1 

KYC, Japan

140m3 hour

Plant 2 

Elba ESM 110B

80m3 hour

Plant 5

Shako Mob 60

40m3 hour

Plant 6

Batching Plant UK

40m3 hour

Concrete temperature control is achieved through the onsite KTI water chilling plant and 62-tonne capacity flaked ice plant. Both limestone and gabbro aggregates are stocked.

Hidd Plant

0

Cubic metres of
concrete per hour


Our Hidd operation has two plants with a combined output of 200 cubic metres of concrete per hour and supplies the Hidd, Muharraq, Sitra, and East/Central Manama areas:

Plant 3 

KYC, Japan

120m3 hour

Plant 4

Stetter H2

80m3 hour

Concrete temperature control is achieved by two onsite KTI chilled water plants and flaked ice plants, with a combined capacity of 120 tonnes of ice per day.

All coarse aggregates are imported from the UAE and offloaded at our adjacent jetty facility. The Hidd aggregate storage area holds 80,000 tonnes of material.

North Alba Plant

0

Cubic metres of
concrete per hour


Our North Alba operation was commissioned in 2017 to support the increased construction activity in the Southern Governorate. The operation has two plants with a combined output of 140 cubic metres of concrete per hour:

Plant 7

Elba 110B

80m3 hour

Plant 8

Meka MB100

60m3 hour

Concrete temperature control is achieved by the onsite KTI chilled water plant and flaked ice plant, with a capacity of 80 tonnes of ice per day.

Mobile Plants

0

Cubic metres of
concrete per hour


Delmon currently has one mobile batching plant available for on-site batching plant operations:

Plant 10 

Skako Mob 60

60m3 hour

These plants can be mobilized at short notice and include all required water storage, admixture tanks, power generation, shaded aggregate storage bays, and ice facilities as required.

Our current site batch plant is located on Hawar Island for the re-development of the Hotel and associated facilities.

Find Us

Salmabad Office: +973 17 783 83
Hidd Office: +973 17 677 466
North Alba Office: +973 77 373 210
Fax: +973 17 784 467
info@delmonreadymix.com