Date | Sept 2016 - Dec 2018Cubic Metre | 0Main Contractor | Nass Contracting / Huta Hegerfeld JV
Consultant | Parsons
Works involved transforming the existing Alba Roundabout into a 3 level interchange that consists of an at-grade intersection, a flyover with 3 lanes in each direction; carrying traffic along Estiqlal Highway and King Hamad Highway, another one-way flyover with 2 lanes carrying traffic coming from Sheikh Jaber Al Ahmed Al Sabah Highway towards King Hamad Highway. The project also includes transforming the existing Nuwaidrat Roundabout into a 2 level interchange, with a 3 lane flyover carrying traffic along Sheikh Jaber Al Ahmed Al Sabah Highway.